From first call to power-on typically takes 2-3 weeks. Here's exactly what happens at each stage.
Week 1: Consultation & Planning
Day 1-2: Initial Contact
- Call or submit online quote request
- Brief phone consultation about your needs
- Schedule in-home assessment
Day 3-5: In-Home Assessment (Free)
- Technician evaluates your electrical panel
- Measures load requirements
- Identifies optimal generator location
- Checks gas line capacity
- Provides written quote on the spot
Day 5-7: Decision & Deposit
- Review quote and financing options
- Sign agreement and pay deposit
- We order your generator
Week 2: Permits & Delivery
Day 8-12: Permit Application
- We submit electrical and gas permits
- Timeline varies by municipality (3-7 days typical)
- We handle all paperwork
Day 10-14: Equipment Delivery
- Generator delivered to your property
- Transfer switch and materials staged
- Installation date confirmed
Week 3: Installation
Installation Day (6-10 hours)
Morning:
- Pour concrete pad (or set pre-cast pad)
- Position generator on pad
- Install transfer switch at electrical panel
Afternoon:
- Run gas line to generator
- Complete electrical connections
- Program and test system
- Simulate power outage to verify operation
Day After: Final Inspection
- City inspector verifies installation
- We address any items (rare)
- System officially approved
What Can Delay Installation?
- Permit backlogs: Some cities take 2+ weeks
- Equipment availability: Popular models may have wait times
- Weather: Concrete can't pour in freezing temps
- Gas line upgrades: If your meter needs upsizing
- Electrical panel upgrades: If your panel is at capacity
Tips for Faster Installation
- Schedule during off-peak season (summer)
- Have your electrical panel accessible
- Know where your gas meter is located
- Clear the installation area in advance